Login
Cylon Support Login (Offsite login)
Active Energy Manager Login (Offsite login)
Trafford Centre
Smart Energy Control

Case Study

Trafford Centre | Manchester - UK. The largest purpose-build retail facility in the north of England

Applications:    Heating, ventilation, air-conditioning and lighting control

Points:   3,500

Number/Type of Building:   5,000 m2 of retail floor, a 20 screen cinema and a 1,600 seat food court

Main Contractor:   Bovis Construction

Consulting Engineer:  WSP Group

System Integrator:   JDP Building Automation Systems Ltd   

    

Top